Skip to navigation

Announcing Our New Manufacturing Facility

Today we announce the opening of our new manufacturing facility in Billerica, Massachusetts. The 25,000 square-foot space will enable us to meet the demands of our current and future customers, more than double our production capacity, and create new jobs within the company.

The Markforged print farm in the new Billerica space

“With the significant growth of Markforged printers in the field, the consumption of our materials continues to increase at a rapid pace,” says Matt Gannon, VP of Operations at Markforged. “Our new facility in Billerica gives us the ability to meet the demands of today and operations for years to come.” Several Markforged materials will be produced at the facility, including our patented continuous carbon fiber and 3D printed metal materials.

The team currently consists of 35 employees, with a plan to hire 25 more people within the next couple of years. “Billerica was the perfect choice for our expansion,” says Gannon. “The region is a hotbed for manufacturing and technology companies, and is strategically located with access to key partners and expertise to support the team."

The kitchen at the Billerica, MA facility

Employees at the Billerica facility will enjoy the same perks as all Markforged employees — including gym access, catered lunches every Tuesday, a wide variety of snacks, and unlimited access to Markforged 3D printers. Interested in joining our Billerica facility? Check out our Careers section!

所有博客和博客中包含的信息版权均归 Markforged 公司所有,未经我们的书面许可,不得以任何方式复制、修改或采用。我们的博客可能包含我们的服务标志或商标,以及我们附属公司的服务标志或商标。未经我们事先许可,您使用我们的博客并不构成您使用我们的服务标记或商标的任何权利或许可。Markforged 博客中提供的信息不应被视为专业建议。我们没有义务根据新信息、后续事件或其他情况更新或修订博客。

不错过任何一篇文章

订阅以在您的收件箱中获取新的 Markforged 内容